Base Power and Cumberland Electric Membership Corporation have agreed to deploy 30 MW of residential battery storage across the Tennessee cooperative’s service territory. The planned systems will operate as a networked fleet that Cumberland EMC can use to manage demand across its system.
Under the arrangement, Base Power will install and maintain every battery. Cumberland EMC will control when the fleet charges and discharges, allowing the cooperative to dispatch the systems during periods of peak demand. The stated objectives are to reduce system peaks and lower Cumberland EMC’s wholesale power costs.
Utility-controlled operation
The agreement places the residential systems within a coordinated utility program rather than treating each battery as an isolated backup product. Cumberland EMC will determine the timing of fleet activity, while Base Power will be responsible for the physical deployment and ongoing maintenance of the equipment.
For cooperative members, each battery is offered at $695 upfront and $19 per month. The program says a battery can provide backup power for up to 36 hours. SolarBytes reports that members can currently join a waitlist ahead of the planned rollout.
| Program detail | Published terms |
|---|---|
| Planned storage capacity | 30 MW |
| Customer pricing | $695 upfront plus $19 per month |
| Backup duration | Up to 36 hours |
| Installation timing | Expected to begin in early 2027 |
| Operations | Cumberland EMC dispatches; Base Power installs and maintains |
First Tennessee and TVA-area partnership
Base Power said the arrangement is its first partnership in Tennessee and its first within the service territory of the Tennessee Valley Authority. The batteries are to be distributed throughout Cumberland EMC’s territory, although the announcement does not provide a unit count or identify the battery models to be installed.
The program’s structure gives the cooperative a residential storage resource that it can operate at system peaks while offering members a home backup service. The published terms distinguish the customer-facing offer from the fleet’s grid function: members receive backup capability, while Cumberland EMC controls the charging and discharging schedule for the networked systems.
- Base Power will install and maintain the residential batteries.
- Cumberland EMC will decide when the fleet charges and discharges.
- Installations are expected to start in early 2027, with a member waitlist available beforehand.
The companies have not published further equipment specifications, individual system sizes or additional program requirements in the announcement. The agreement is therefore currently defined by its planned fleet capacity, member pricing, backup-duration claim and division of operational responsibilities.